|
Trang Ðầu
| Tiểu Sử Các Thánh
| Lịch Sử Giáo Xứ
| Vườn Trẻ
| Nối Kết
| Phân Ưu
| Bảo Trợ
|
Trường Việt Ngữ
|
| HOLY
MARTYRS OF VIETNAM PARISH
Holy Martyrs of Vietnam Parish was established by Bishop Thomas J. Welsh on August 19, 1979 as the first Vietnamese National Parish in the U.S.. It started as the Vietnamese Catholic Community in Arlington with 25 families in 1975. When Bishop Welsh dedicated our first church on Annandale Road in 1979, there were about 130 families. Six years later we moved to our present location and now we have multiplied by more than one hundred folds. As of now, after 30 years, we have over 9,000 parishioners and 2,250 families. The existing church can seat 760 persons. On Sunday and especially on Christmas, Eater and Solemn Feast Days, the congregation spills out to the lobby and down to the basement for viewing mass on a screen. Some people had to stand outside the front doors. It was urgent that this overcrowding had to be solved. On January 30, 2006 Father Vuong Nguyen, pastor submitted to Bishop Loverde a Request to Start Proposed Parish Project and received his approval on a letter dated February 1, 2006. Bishop Loverde approved a 10,000 SF extension. The lobby will be extended to the North and West, glass windows will be installed on these two sides of the sanctuary. This will allow about 1,000 more chairs to be set up here. People seating in this area could follow the mass directly through the windows or via projection screens. A main entrance and a West entrance will provide access to the church through 6 doors. The middle doors of these two entrances will be constructed under two tall canopies with curved roofs. The roofs will be covered with red ceramic tiles. This will give the church an oriental look. Inside the sanctuary, the stations of the Cross will be new. The balcony on the Mezzanine will be lowered and a plexiglass portion will be installed to allow people seating up there to see the altar. Lighting and sound-system throughout the church will be replaced. New A/C units will be installed with registers on the floor instead of being on the North wall blowing air on top of the congregation. The basement will be enlarged to provide more classrooms. The ground floor has new offices for three priests and the secretary. A large meeting room and new bathrooms will be located on this floor. An elevator will connect the basement with the mezzanine. In the basement a lift will replace the stairs. The whole church will have sprinkling system installed for fire protection. New carpets and pews will be installed. The fellowship hall will have cabinets for storage, and a higher stage for future celebrations and activities. The kitchen will be renovated completely to meet the codes for a commercial facility. All old doors will be replaced with new locks. A meeting to decide what doors on each level will have what kinds of master keys has been convened. Since February 2006, the Parish Building Committee have met with the Office of Planning Construction and Facilities and started the process of planning the project with OPFC and Geier Brown Renfrow Architects. After two years of planning, designing, and revising the scope to meet our need and our budget of 6 million dollars, the Design Development documents were completed on June 6, 2008. The next steps were the bidding of a General Contractor, Whitener & Jackson Inc. was selected from 5 candidates. The development of the Construction Documents was completed and the submission of a building permit to Arlington County was approved. The church received the approval of Bishop Loverde to organize a Groundbreaking Ceremony. Construction began on March 25, 2009 and scheduled to be completed in April of 2010. As of today, September 8, all steel structures are in place, the outer walls are being insulated. Elevator shaft and stairways are completed. Bar joist and decking for the roof are installed. Sprinklers are installed in the basement. All A/C units and other machineries have arrived. According to the General Contractor, the project is ahead of schedule. All roofs will be covered before Christmas. The congregation is very excited to see the progress of the project. Everyone is looking forward to see the new church in the Spring. With special arrangements, during the weekends, the sanctuary is still available for worship starting at 3 PM on Friday, through Sunday night. Masses during the week are celebrated in the chapel in the Education Building. Due to the lack of parking spaces, the pastor has added a 6:30 AM and a 9:00 PM masses on Sunday. We are very lucky not to have to close down the church and move the masses to another church or school in the area. The parish will continue to raise money for the next project: the expansion of the parking areas. The contributions of the priests and the congregation: Rev. John Baptist Nguyễn Đức Vượng was assigned as Parochial Vicar in August, 2000. He assisted the pastor: Rev Anthony Đinh Minh Tiên, the first Dominican priest at Holy Martyrs of Vietnam through the arrangement between the Arlington Diocese and the Vietnamese Vicariate in Calgary, Canada. During his term as assistant pastor, father Vuong has planned for the renovation of Our Lady of Lavang Shrine. When father Tiên went to school in Rome, father Vuong became the pastor in August of 2003. Rev. Đoàn Bình Minh was assigned as the vicar. From then father Vuong started to plan for the expansion of the church and the parking lots. With the cooperation of the Parish Council, the Finance Committee, and the generosity of the congregation, many fund raising events were launched: brochures and letter soliciting the contributions from the congregation were sent, many banquets were organized at Fortuna, and Harvest Moon Restaurants, and at the Kena Shrine, and many car raffles were organized. Proceeds from Vietnamese New Year Fairs and food stands of the various parish organizations also brought in a lot of money. Thanks to the contributions and hard work of everyone, the parish raised enough money for the project without having to borrow money from the diocese. In June 2008, father Minh went to Rome to study, father Ngô Văn Thích and Phó Quốc Luân replaced him. Father Vuong completed the construction of a new La Vang Shrine with white and black diamond marble, the installation of the iron fences around the premise, built the 4 gates, added more parking spaces by reducing the grass areas, installed the 14 outdoor stations of the cross with lighting, and installed the statue of the Martyrs next to the bell tower, another statue was installed in the Garden of the Martyrs at Fairfax Memorial Park. During the construction period, masses are celebrated in the chapel in the Education Building on weekdays. Weekend masses are still celebrated inside the church from the afternoon of Friday through Sunday. Because the construction yard took over many parking spaces, Father Vuong had to increase the number of masses on Sunday. He added a 6:30 AM and a 9:00 PM masses beside the Saturday 6:00 PM, the 8:00 Am, 10:00 Am, 12:00 noon, 5:00 PM and 7:00 PM mass at Reston. The congregation is very excited to see the rapid progress of the construction. Everybody is looking forward to seeing the completion in the spring of 2010.
KẾ HOẠCH BÀNH
TRƯỚNG VÀ CHỈNH TRANG GIÁO XỨ CÁC THÁNH TỬ ĐẠO VIỆT NAM ARLINGTON Giáo xứ Các Thánh Tử Đạo Việt Nam Arlington Virginia được Đức Cha Thomas J. Welsh thiết lập ngày 19/8/1979 như giáo xứ thể nhân Việt Nam đầu tiên trên đất Mỹ. Năm 1975 khi làn sóng di cư đầu tiên đến đây, Cộng Đồng Công Giáo Việt Nam Arlington được thành hình với 25 gia đình. Khi tạo mãi nhà thờ đầu tiên tại Annandale, VA năm 1979, giáo xứ chỉ có 130 gia đình. Sáu năm sau đã trả hết nợ và di chuyển đến đia điểm hiện thời tại Arlington năm 1985, con số giáo dân lúc đó đã tăng lên gấp trăm. Hiện nay sau 30 năm thành lập, giáo xứ có trên 9.000 giáo dân và 2.250 gia đình. Nhà thờ mới tại Arlington chỉ chứa được 760 người. Ngày Chúa Nhật va các ngày lễ trọng, nhất là Mùa Phục Sinh và Giáng Sinh, giáo dân phải xem lễ ngoài hành lang nhà thờ và dưới hầm qua màn ảnh truyền hình. Nhiều người phải đứng ngoài cửa xem lễ vọng. Nhu cầu gia tăng diện tích cơ sở trở nên khẩn cấp. Ngày 30 tháng 1, 2006, cha xứ Nguyễn Đức Vượng trình lên Đức Cha Loverde lá thư xin phép xây cất và được ngài chấp thuận qua thư ngày 1 tháng 2, 2006, cho giáo xứ được bành trướng thêm 10.000 bộ vuông. Phần hành lang bên ngoài sẽ được bành trướng sang phía bắc và tây, với các cửa kính gắn xung quanh hai bức tường này. Điều này sẽ cho phép kê thêm khoảng 1.000 chiếc ghế tại khu vực nới rộng. Giáo dân ngồi tại đây có thể tham dự Thánh Lễ qua cửa kính hay theo dõi trên màn ảnh. Hai cửa tam quan sẽ được xây cất phiá bắc và phía tây, với hai cửa chính cao và rộng nằm bên dưới hai chòi có mái cong. Toàn bộ mái lợp trên khu vực nới rộng sẽ được gắn ngói đỏ, khiến cho nhà thờ mới sẽ có hình ảnh của một nhà thờ mái cong kiểuViệt Nam. Bên trong nhà thờ, 14 chặng đàng thánh giá sẽ thay mới. Lan Can trên gác đàn sẽ được hạ thấp và gắn kính để ngồi trên lầu vẫn có thể thông công trong Thánh Lễ. Đèn trong nhà thờ và hệ thống âm thanh toàn diện trong ngoài sẽ đổi mới. Thảm cũng như các ghế ngồi/quỳ sẽ được thay mới. Hệ thống sưởi và máy lạnh hoàn toàn mới: hơi được phun từ sàn lên thay vì từ trên đầu xuống một phía thôi. Hầm nhà thờ được nới rộng cho có thêm lớp học. Tầng trệt có văn phòng cho ba cha và thư ký, và một phòng họp lớn. Có thang máy nối hầm với tầng lầu trên, và một thang máy nhỏ cho hầm nhà thờ. Tất cả nhà thờ được gắn hệ thống phun sương để phòng ngừa hoả hoạn. Hội trường dưới hầm sẽ có các tủ chứa đồ dành cho các hội đoàn. Bức tường phía trên và các cầu thang được phá đi khiển cho có thể dựng một sân khấu cao và rộng cho các chương trình sinh hoạt tương lai. Nhà bếp sẽ được chỉnh trang hoàn toàn mới cho phù hợp với tiêu chuẩn của một bếp thương mại. Các cửa cũ sẽ được thay mới với các ổ khoá mới. Đã có buổi họp để ấn định các loại chìa khoá master keys khác nhau cho các phòng sở. Kể từ tháng Hai, 2006, Uỷ Ban Xây Cất Giáo Xứ đã họp thường xuyên với văn phòng Điạ Ốc của Điạ Phận và tổ hợp kiến trúc Geier, Broan and Renfrow. Sau hai năm thiết kế, phác họa và duyệt lại tầm vóc bành trướng cho phù hợp với ngân khoản dự trù 6 triệu dollar, các tài liệu phác họa việc Phát Triển đã hoàn tất ngày 6 tháng 6, 2008. Bước kế tiếp là đấu thầu nhà thầu chính (General Contractor). Hãng Whitener & Jackson Inc. được lựa chọn trong số 5 ứng viên. Việc phát triền các Tài Liệu Xây Cất được hoàn tất và giấy phép xây cất đã được Quận Arlington cấp phát. Giáo xứ được Đức Cha Loverde cho phép tổ chức nghi thức Đặt Viên Đá Đầu Tiên, và việc xây cất chính thức khởi sự ngày 25 tháng 3, 2009. Lịch trình xây cất dự trù hoàn tất đầu tháng Tư, 2010. Tới ngày hôm nay, tất cả các khung sắt đã được dựng, các vách bên ngoài đang được gắn lớp cách nhiệt. Giếng cho thang máy và các cấu thang đã xây xong. Các đà cho các tầng và mái đã được gắn, Hệ thống phun sương dưới hầm đã hoàn tất. Tất cả các máy lạnh và máy móc khác đã được chở đến. Theo nhà thầu việc xây cất đã tiến hành nhanh hơn lịch trình dự trù. Các mái sẽ được lợp trước Giáng Sinh năm nay. Sự đóng góp của quý cha và cộng đoàn: Cha Gioan Baotixita Nguyễn Đức Vượng được bổ nhiệm làm cha phó Giáo Xứ CTTĐ Arlington vào tháng 8 năm 2000, ngay sau khi chiụ chức linh mục. Ngài làm cha phó cho cha xứ Đinh Minh Tiên, là cha Đa Minh đầu tiên tới giáo xứ qua sự ký kết của giáo phận với Phụ Tỉnh Đa Minh Hải Ngoại. Ngay trong thời gian làm cha phó, ngài đã có ý định xây cất Đài Đức Mẹ La Vang rộng lớn hơn đài cũ. Khi cha Tiên đi du học Rôma, cha Vượng được bổ nhiệm làm chánh xứ từ tháng 8, 2003. Cha Đoàn Bình Minh được bổ nhiệm làm cha phó. Từ đó cha Vượng đã xúc tiến việc nghiên cứu để bành trướng chỗ ngồi trong nhà thờ và bãi đậu xe. Với sự hợp tác của Hội Đồng Mục Vụ, Uỷ ban Tài Chánh, và lòng quảng đại của các nhà hảo tâm trong giáo xứ, rất nhiều chương trình gây quỹ đã được thực hiện: Các brochures và thư quyên góp được gửi đến các gia đình, các dạ tiệc gây quỹ được tổ chức tai nhà hàng Thần Tài, Harvest Moon và Kena Shrine. Các cuộc xổ số xe hơi và các giải khác cũng được thực hiện. Các Hội Chợ Tết và các hội đoàn bán hàng gây quỹ hàng tuần trong hai năm. Nhờ sự đóng góp tích cực của mọi người, giáo xứ đã có đủ tiền để xin xây cất mà không cần vay tiền của Điạ phận. Năm 2008 cha Minh đi du học, hai cha phó Ngô Văn Thích và Phó Quốc Luân thay thế khiến cho cha xứ bớt vất vả. Ngài đã xây được tượng đài Đức Mẹ La Vang bằng cẩm thạch tuyệt đẹp, làm hàng rào sắt chung quanh khuôn viên nhà thờ, xây 4 cánh cổng ra vào, mở rộng bãi đậu xe bằng cách dẹp bớt sân cỏ, gắn 14 chặng đàng thánh giá ngoài trời, gắn hệ thống đèn chiếu sáng bãi đậu xe, thực hiện bức tượng các thánh Tử Đạo dưới chân tháp chuông và ngoài nghĩa trang giáo xứ. Trong thời gian xây cất, chỉ được làm lễ trong nhà thờ từ chiều thứ sáu đến chiều chủ nhật. Ngày thường phải làm lễ tại nhà nguyện trong Hội Trường Giáo Dục. Công trường xây cất chiếm rất nhiều chỗ đậu xe, nhờ có 3 cha, cha xứ đã gia tăng số thánh lễ cuối tuần: ngoài thánh lễ 6 giờ chiều thứ sáu, còn có thánh lễ 6:30, 8 giờ, 10 giờ, 12 giờ, 5 giờ, 7 giờ chiều tại Reston và 9 giờ tối tại giáo xứ. Việc này khiến cho đỡ kẹt xe trong bãi đậu. Giáo dân hết sức phấn khởi vì thấy tiến trình xây cất được thực hiện mau lẹ. Mọi người trông đợi ngày khánh thành sang năm.
| ||||||||